Statutory AuditElectrical Safety

Electrical Safety Audit & FLIR Infrared Thermography

Zero electrical fire risk and arc flash prevention via electrical load balancing, FLIR thermal imaging, and earth pit impedance testing.

Aligned with Central Electricity Authority (CEA) Regulations 2010 & IEEE Standards

Governing standard

Central Electricity Authority (CEA) Regulations 2010 & IEEE Standards

Audit Standard
Statutory Third-Party
Scope Items
6 checkpoints
Instrumentation
4 calibrated tools

Audit & advisory scope

Every engagement is executed clause-by-clause against the governing standard — no generic checklists, no corner-cutting.

01

Quantitative Infrared Thermography of Transformers, HT/LT Panels, Busducts, and Capacitor Banks (FLIR)

02

Measurement of Earth Pit Resistance across all dedicated electrical and lightning protection pits

03

Evaluation of Earthing Continuity and neutral-to-earth voltage checks

04

Assessment of Overcurrent, Short-circuit, and Earth Leakage Protection (ELCB / RCCB / VCB)

05

Inspection of Cable Trays, conduit integrity, hazardous area explosion-proof fittings (Ex-rated)

06

Implementation review of Lockout / Tagout (LOTO) procedures and Single Line Diagrams (SLD)

FLIR Calibrated Thermal Imaging CameraEarth Resistance Tester (Digital 4-terminal)Power Quality Harmonic AnalyzerInsulation Resistance Tester (Megger)

What you receive

Signed, presentable, defensible.Turnkey deliverables your board, auditors, and statutory authorities accept on the first pass.

  1. 01

    Comprehensive Infrared Thermography Report with hot-spot thermal images and temperature delta (ΔT)

  2. 02

    Earth Pit Measurement Logbook with BIS/CEA compliance status

  3. 03

    Actionable Electrical Risk Mitigation & CAPA Plan

  4. 04

    DISH-compliant Electrical Safety Audit Certificate

Scope this engagement

Request a proposal for Electrical Safety Audit & FLIR Infrared Thermography

Tell us about your sites, current compliance position and timeline. We will come back with a scoped proposal under Central Electricity Authority (CEA) Regulations 2010 & IEEE Standards — priced, resourced and sequenced for your operation.

  • A senior engineer — not a salesperson — responds within one business day
  • Indicative scope, timeline and fee with no obligation
  • Confidential review; site data is never shared

We reply within one business day. Your details stay with our practice team.

Frequently paired with

Ready to make this site audit-ready?

Spend 30 minutes with our lead consultants and receive an indicative scope, timeline, and fee structure for electrical safety.

Book the consultation